Complete Mechanical Installation of the Core Plant, which consisted of: the Process Plant (Reactor and Briquetting), Gas Generation Plant, Structure Buildings, Pipe Racks, Pipings, Utilities, Insulation, Refractory, Painting and all Main and Auxiliary Equipment. In Addition, Pipe Rack Fabrication and Partial Piping Pre-Fabrication was carried out. The Total Weight Installation was 46,000 Tons. |